
OPW Portumna Council Offices
Built Heritage
ProSurface successfully completed a 700-square-metre Resin Bonded Gravel installation at the OPW Portumna Council Offices, collaborating with the council, architects, engineers, and contractors. This £70k project was delivered on time and to specification, enhancing the site's aesthetic appeal and functionality with a durable, low-maintenance surface.
Project Summary
At the design stage of the Portumna Council Offices project, ProSurface engaged in a comprehensive collaboration with the council, architects, engineers, and contractors. The goal was to deliver a high-quality surfacing solution that aligned with both aesthetic and functional needs.
Following initial design discussions, ProSurface attended a site meeting at the start of works to ensure all parties were aligned on the scope and execution of the project. Prior to the placement of the Resin Bonded Gravel, another review was conducted to confirm the exacting specifications and timelines.
ProSurface laid 700 square metres of Resin Bonded Gravel, chosen for its durability and low maintenance, which provided a smooth, weather-resistant surface ideal for the project. The installation was completed within the agreed timeframe, ensuring the project was delivered on schedule and met the high standards expected by all stakeholders.
The detail
Other Case Studies
Musgrave Park Hospital
Warrenpoint Municipal Park
Bankmore Square, Belfast